Testimonials

Churchill Retirement Living

Churchill Retirement Living developed our first Retirement Lodge in Wetherby, during 2016 & 2107. Being a new geographic location for us, we need contractors we can rely on more than usual. Indepth Civil Engineering proved to be ideal for us. Indepth’s Project Manager worked very closely with us to complete the drainage and foundations in good time and hard and soft landscaping to good quality. We look forward to discussing our next opportunity in the area with Indepth with a view to working together again.

Midlands Commercial/Construction Director

Yorkshire Water

I would like to express my appreciation to all the site staff and management. The job was no easy task with many high risks and very little room for any manoeuvre having to deal with the public, councils and highways, real congestion of other utilities as well as ongoing third-party works and public transport. It was a good job, which was managed professionally in which safety was paramount by both the management team and the operatives…any advice I gave the site staff was received appreciatively and implemented straight away which made the audit trail impressive…Thanks again for a job well done.

Yorkshire Water

Morrison Construction

Indepth Civil Engineering carried out the construction of 2 No. manhole shafts using segmental rings and a top down construction. These were constructed over an existing live culvert and included headings for the inclusion of a new culvert diversion, which was also carried out by Indepth. The shafts were circa 6.0 m diameter and 5.0 m deep. The work was carried out in a safe and professional way with the client being very happy with the finished product. Where problems arose, Indepth contributed greatly to solving the problem.

Project Manager

West Yorkshire Properties Ltd

We have been using Indepth for the last 14 years and found them to be competitive, hard working and provide a high standard at all times.

Property Manager

Environmental Techniques

Prompt response to our enquiry and completed works ahead of programme. Good adherence to health and safety at all times. Excellent service from start to finish, considering the difficulty of the works and the traffic management restrictions.

Director

GeoEnvironmental

Indepth provided a great service, the site operator got on with the job and worked efficiently, such that work was completed ahead of programme, which pleased our client.

Director

Black and Veatch Ltd

This is the second project I have had the pleasure of working with Indepth. I found his staff to be courteous and polite at all times. The standard of their workmanship along with experience was very good as also was their attitude towards health and safety. Along with a good knowledge and commitment to protecting the environment. I would not hesitate to call on their services in the future should the situation arise.

Superintendent/Operational Safety Coach

Yorkshire Water

As part of our AMP6 capital delivery programme In-depth carried out a large proactive scheme in the Keighley area to help reduce localised flooding incidents. Throughout the scheme, Indepth not only provided a first-rate civil service but also provided fantastic customer service to our customers. The scheme was very intrusive and their staff were praised multiple times for their work ethics and behaviour. The construction works were all to time cost and quality and helped us reduce flooding incidents significantly in the area. Health and Safety was always of a good standard. The scheme has been seen as a shining star at Yorkshire Water for the most effective way to combat flooding incidents. The processes used on this scheme have been carried across business-wide.

Project Manager

Yorkshire Water

Under our emergency programme, In-Depth were mobilised to carry out a repair to a Short Sea Outfall situated in a busy tourist village on the East Coast of Yorkshire. In Depth were able to attend site within 24 hours and were quickly able to identify and fix the problem. With bathing season approaching it was absolutely imperative that the problem was identified and remedied in the quickest possible time and our key stakeholders were very pleased with the speediness and quality of the repair.

Project Manager

Cookies

This website uses cookies. You can read more information about why we do this, and what they are used for here.

Accept Decline