During the winter months and often in harsh conditions Indepth carried out the installation of 4km of towpath renewal alongside Skipton’s stretch of the Leeds and Liverpool Canal.
The works were carried out from both the canal side and from barges which were pulled by a canal tug. The tugboats carried the aggregates to the location of the works and also carried our excavators and operators who were working on board the barges in order to place the materials.
Back to allCookies
This website uses cookies. You can read more information about why we do this, and what they are used for here.