The works consisted of the following elements of work:
One of the most interesting parts of the scheme was the excavation of the canal bed and installation of electric ducts under the canal which facilitated special core drilling techniques and specialist diving teams. The trench was excavated from a barge using a 3t excavator and the ducts were held in place using steel anchors and clay filled sandbags.