The works involved a scheme to reduce infiltration into a closed landfill in Northwest England.
We undertook the installation of over 6km of fin drain to collect rainfall and divert via collector pipes to a 400 linear metre drainage trench running at the toe of the perimeter of the landfill.
Works carried out:
The works were undertaken to demanding health, safety and environmental requirements together with a short timetable to meet the client’s site requirements.